Fallback-banner: Badeanlegg

Bølgen Bad - Drøbak

Client

Frogn kommune (Frogn municipality)

Customer

HENT Entreprenør AS

Enwa Badeanlegg has delivered the water treatment system and two steel pools to Bølgen bad in Drøbak. The pool opened in June 2019.

Enwa Badeanleggs delivery

Enwa Badeanlegg delivered two steel pools. One of 25 x 21 meters with diving depth, and one steel pool of 12.5 meters x 8.5 meters with folding stairs, HC lift and adjustable floor. 

The wave pool was delivered with a flow channel with 600 m3/h circulation to slide and 120m3/h for the wave machine.

In addition, we provided a children's pool with water attractions in three water levels, a whirlpool, and an ice pool.

Four water treatment systems were delivered with a traditional sand filter system, a well-tried and tested treatment method. A total of 550 cubic meters are circulated per hour.

Camera surveillance and underwater lighting

For extra security in the sports pool, therapy pool and wave pool, Enwa provided camera surveillance with drowning alarms and underwater lighting.

The complex is now complete with four pool areas, with a 25-meter competition pool with diving tower, three-part children's pool, training and therapy pool, and a wave pool with a 72-meter long slide and climbing wall - to the delight of the city's residents.

See Bølgen bads web pages for more

Designed by Allegro - Developed by Aplia - Powered by eZ PublishPrivacy

This site uses cookies. Read more about cookies here. Do not show this message again.